View Single Post
  #56  
Old 02-08-2012, 08:57 PM
SoapKart SoapKart is offline
Contributor
 

Join Date: Jun 2011
Posts: 144
Default

The head showed up last Friday and I was able to get it installed over the weekend. I haven't fired it up yet. I want to get a couple things sorted out first. In the meantime I have some photos of some of the changes I've made to the frame.

I added a piece of angle down the middle of the front mount


I added some bracing across the front. Also created a dash for the new tach/speedo;



I added a brake light but I decided to install a larger gas tank so the rear rack was increased and the stock bars will be replaced with some that flow with the new rack so the brake light will need to be done over. I even had the wires running internally


Pics of the larger rack and new tank. I still need to add some support bars to the new rack.




One last picture of the beefed up front spindle. I found that I was making slight adjustments to the red buggies when I bottomed out the shocks a couple times with some ruff landings.