Got a foot of 1" I.D. with 3/8" wall pipe. (HEAVY DUTY $h!t)
Drilled one end 1 1/8" X 1/2" deep to recieve the hub
Drilled and tapped the other end for 3 set screws.
Installed the pipe
Slid the hub into it and secured axle nut
Tack welded it in a couple places
When happy, I welded it up good.
Hope this helps prevent the broken axle issue.
|