View Single Post
  #473  
Old 08-28-2012, 05:17 PM
x-bird's Avatar
x-bird x-bird is offline
Power User
 

Join Date: Oct 2011
Location: Penciltucky
Posts: 2,518
Default

Ended up cutting the right side engine hangar and moving it to the left to get the sprockets back in alignment. engine was pretty crooked, it must have been progressively getting worse ...

While I have the swingarm off, I decided to go with heims instead of trying to make bushings. My buddy Frank is making up a pair of 1.5 diameter "bungs" to fit inside the box tubes and mount the 1/2 inch heims into. Overall it's going to extend the wheelbase about 2 inches. Once these are together I'll test he swingarm travel to find out if i need to cut anything else out of the way. That's the one thing i didn't test---figured (wrongly) that the shocks would bottom out first based on their total travel.

Still need to grind the welds down to get the tube fully seated.
Attached Images
File Type: jpg chain3.jpg (23.5 KB, 19 views)
File Type: jpg chain4.jpg (27.3 KB, 19 views)
File Type: jpg chain6.jpg (25.8 KB, 19 views)
File Type: jpg chain7.jpg (28.2 KB, 18 views)
File Type: jpg chain8.jpg (23.9 KB, 19 views)