Almost have the engine back together and ready for mount fabrication. Meanwhile, working on the swing arm and getting the ride height and swing arm angle sorted out for the correct engine angle. Chopped the original go and stop pedals up and used them for the upper mounts, they were just the right spacing apart to not use them, and the lower from good ol' 1/4" plate. These are blaster shocks, measured at 13.5" eye to eye. Managed to get one mounted, and modified the original swing arm bushings to work by staking the swing arm portion enough to create a tight fit, and found some copper washers from work that should keep the bushings in place(they were sliding in the swing arm, otherwise in good condition), I know its not the best option.
__________________
ASE Master and Toyota Master Diagnostic Certified
Buggy Building Trainee
'04 Dazon Raider 150 'modded'
|