was darn hot today. welding is definitely a winter sport.
i believe all the frame fab is done. both tanks are mounted and the final tubes are in the cage. just have to finish welding and grinding them.
i changed the mount on the 2nd one because the dimensions of the rack were slightly different from the fix. i made the back mount welded on instead of a bolt on cause of less space. works good.
__________________
"LUCIFER" JOYNER JD400,
CROSSHAMMER 250R,
YERF GX150,
CROSSFIRE MBX150,
BMS 800V-TWIN
'16 RZR 900s ,
'17 ACE 900XC,
'99KX250,
'94 KDX200,
'18 SSR SR170TX
|