View Single Post
  #93  
Old 05-28-2012, 12:45 PM
x-bird's Avatar
x-bird x-bird is offline
Power User
 

Join Date: Oct 2011
Location: Penciltucky
Posts: 2,518
Default

i think ckau buys pre-bent sections, welds them up and routes the pipe topside. might be a method worth looking into. I was looking at the front hangars thinking they could use some beefing up. (triangle boxes of 1/8th sheet) Looks like i'll do all three.

Last edited by x-bird; 05-28-2012 at 12:47 PM.
Reply With Quote