View Single Post
  #96  
Old 05-28-2012, 10:18 PM
xlint89's Avatar
xlint89 xlint89 is offline
Senior Member
 

Join Date: Dec 2011
Location: cleveland OH
Posts: 1,064
Default

Quote:
Originally Posted by x-bird View Post
i think ckau buys pre-bent sections, welds them up and routes the pipe topside. might be a method worth looking into. I was looking at the front hangars thinking they could use some beefing up. (triangle boxes of 1/8th sheet) Looks like i'll do all three.
Thanks, I'll look into this.
Reply With Quote